Shalak Consultant Contribution: Contribution was limited to data collection and provision of technical support to DAWSSA for supervising the project study.
The Project Features at a Glance:
The project included: the preparation of a feasibility study for the improvement of the wastewater situation to achieve an ecological sound environment being at present heavily polluted through directly discharged raw domestic and industrial wastewater, for the Yarmouk area by developing measures for the sewer collection and selecting a suitable technique to be adopted in the design of the wastewater treatment plant.
Beneficiary Party: | Damascus Water Supply and Sewerage Authority (DAWSSA) |
Funding Agency: | German Development Bank (KFW) |
Consultant: | CES Consulting Engineers Salzgitter GmbH |